Title Year Price
Predicting the Saturated Hydraulic Conductivity of Natural Soil 2019 $10.00
Proper Fluid Management for Successful Installations 2019 $10.00
Protecting a National Treasure: Rehabilitation of 20" Watermain Under a Bridge Feeding Fort William McHenry Baltimore, MD 2019 $10.00
Protecting Anchorage's Costal Wildlife Refuge by Sliplining 16,000 feet of Sanitary Sewer Force Main 2019 $10.00
Rationalization and Implementation of an Upgrading Approach for the Northeast Interceptor in Winnipeg, Manitoba 2019 $10.00
Redding, California Successfully Uses Static Pipe Bursting for Over 3 Miles of Gravity Sewer Mains and Laterals 2019 $10.00
Re-Defining Field Applied ARO's 2019 $10.00
Reducing Risks of Microtunneling from the Pipe's Perspective 2019 $10.00
Reducing the Risk of Cross Bores 2019 $10.00
Rehabilitation of the 1917 NATS Trunk Sewer 2019 $10.00
Rehabilitation of the Barton Street Horseshoe-Shaped Combined Sewer in Hamilton, Ontario 2019 $10.00
Rehabilitation of Various Trunk Sewers in City of Toronto 2019 $10.00
Removal of Large Concrete Obstruction on 96-in. Pipe Ram Crossing of Highway 61 in Neebing, Ontario 2019 $10.00
Removing Workers From Danger Zones During Exit-Side Horizontal Drilling (HDD) Operations 2019 $10.00
Selection Process Challenges: Force Main Study Considers Variety of Trenchless Technologies and Corresponding Stakeholder Impacts 2019 $10.00
Service Abandonment Without Excavation 2019 $10.00
Sharing Perspective - How Bid Items Effect the Cost and Construction of a Pipe Bursting Project 2019 $10.00
Simple Tool for Operators to Quantify I-I, Detect Leaks & Measure Rehab Progress 2019 $10.00
Sioux Falls, South Dakota I-229 Trenchless Crossing Obstacles Overcome through Teamwork and Perseverance: Or How Did We Miss That 2019 $10.00
Sliplining 120-In. RCP Wastewater in Dallas, Texas 2019 $10.00