Title Year Price
3.6 Mile Sewer Force Main Repair and Rehabilitation 2019 $10.00
34 Years of Quality Assurance Testing for CIPP in Winnipeg, Manitoba 2012 $10.00
350+ Towns And Cities Can't Be Wrong! Considerable Water, Money and GHG Savings with CIPP Water Rehabilitation 2013 $10.00
36-in. HDD Gas Pipeline Crossing of Highway 880 in Fremont, California 2016 $10.00
38'' Diameter Microtunnel at Pearl Harbor, Hawaii 1993 $10.00
3D Modeling of Pipe Liners with Local Defects 2008 $10.00
3D Modeling of Pipe Liners with Thickness Variations 2004 $10.00
3rd Time's The Charm- South Tah HDD Success Softens Bad Memories Of Previous Failures 2001 $10.00
40-Year Old RCP: What to do 2018 $10.00
4200 Foot HDD Below Chin Lake Reservoir in Alberta Canada 2007 $10.00
4200' HDD CROSSING FOR 20'' PIPELINE COMPLETED IN SOLID ROCK IN SUB ZERO WINTER CONDITIONS. 2007 $10.00
42-in. Direct Pipe Through 227MPa Rock 2019 $10.00
50 Ft. of Peat - Design Challenges of Three HDD Crossings of the Sacramento River 2012 $10.00
54 Inch by 36 Inch Brick Interceptor Lining: Product and Design Parameters, in the City of Boston, Massachusetts 2017 $10.00
54-in. Sanitary Sewer Force Main - Rehabilitate, Replace or Both 2013 $10.00
60-inch Sanitary Sewer Interceptor Rehabilitation under Submerged Groundwater Conditions - Lessons Learned 2018 $10.00
72"-66" Jack and Bore Challenges encountered under CA 91-freeway and Carbon Creek Flood Channel 2018 $10.00
72-in. Brick Sewer Rehabilitation in Downtown Washington, DC 2017 $10.00
72-in. Interceptor Lining in the City of Saskatoon, Saskatchewan (2009) 2009 $10.00
84 '' RCP SANITARY SEWER INTERCEPTOR REHABILITATION - PHASE VIIB CITY OF SAN JOSE 2007 $10.00